# SBLN Vote - Why did Cllr Coombes get "special treatment"?
- URL: https://bristol-uncovered.uk/sbln-vote-why-did-cllr-coombes-get-special-treatment/
- Published: 2026-11-28T14:32:55.000Z
- Updated: 2026-11-28T14:32:55.000Z
- Author: Chris McEvoy

The Council published [dozens of documents](https://democracy.bristol.gov.uk/mgAi.aspx?ID=46313&ref=bristol-uncovered.uk#mgDocuments) in preparation for the vote on the SBLN that will take place at the Transport & Connectivity Committee on 3rd December 2026.

These documents contain over a quarter of a million words, which is the equivalent of three average length novels, and is 30% more words than the New Testament contains.

It would take approximately 39 hours to scrutinise at 100 words per minute, excluding cross-referencing and checking calculations.

Then there is the time required to examine and understand the diagrams that are included in the documents.

Setting aside the spelling mistakes, the documents also contain many incorrect calculations, inconsistent statements, and missing details.

In this article I have just reviewed one of these documents in order to illustrate how the SBLN Scheme has been managed by the Council.

## SBLN Project Risks

The [Project Risk Log](https://democracy.bristol.gov.uk/documents/s135124/Appendix%20HGG%20-%20Project%20Risk%20Register%5FRedacted.pdf?ref=bristol-uncovered.uk) has been published as a PDF document.

![](https://storage.ghost.io/c/7e/00/7e00f3c6-351e-48d6-a922-14b85820294b/content/images/2026/11/image-68.png)

This has been exported from a spreadsheet, but as commonly happens with BCC they have not included all of the information in the spreadsheet due to the cells not being expanded to show all of the text available when exported as a PDF. 

Here are a few examples where the full text has not been included.

![](https://storage.ghost.io/c/7e/00/7e00f3c6-351e-48d6-a922-14b85820294b/content/images/2026/11/image-69.png)

I have converted the PDF file to an excel spreadsheet to make it easier to read, but it does not include the information that was removed when BCC created the PDF and should not be considered to be an accurate record of the risk log.

[project\_risk\_registerThe SBLN Project Risk Registerproject\_risk\_register.xlsx18 KBdownload-circle](https://bristol-uncovered.uk/content/files/2026/11/project%5Frisk%5Fregister.xlsx "Download")

Here are a few of the risks included in the document:

### Risk 1 - Scheme requires re-design following public consultation

Key Cause: **Consultation feedback**

Key Consequence: **Largescale re-design and resource allocation**

Existing Controls: **Resource allocation plan**

Additional Mitigation Actions: **Design of scheme taken in house and led by engineering design**

---

This risk was identified on "06.01.2026" and was Closed on "31.01.206" (I think they actually meant "31.01.2026").

Closing this risk implies that no changes will be made to the proposed plans as a result of previous or further public consultation.

I do not understand how the additional action of "**Design of scheme taken in house and led by engineering design**" actually mitigates this risk. Perhaps by taking the design in house means that the Council have full control of the process and don't have to involve any external consultants who might not "give the right answer".

****My Summary:** Just ignore any criticism of the design or any suggestions to change the design.

---

### Risk 2 - Political will for challenging scheme across multiple wards

Key Cause: **Liveable Neighbourhood schemes are far reaching and likely to attract negative PR**

Key Consequence: **Challenging to co-ordinate holistic design that meets ATE quality requirements**

Existing Controls: **Regular briefings with leadership of Council and Transport chair**

Additional Mitigation Actions: **Continual briefings with senior leadership, ward member disagreements escalated to political part(y) to be dealt with at party level, so that officers have a clear steer of direction. This will minimise re-design.**

****My Summary:** Make sure Councillors are kept in line and don't question the scheme.

---

****Question:** Which political party or parties are referred to, who is responsible for resolving these disagreements, what authority political parties have to direct officers on scheme design, and whether records of these discussions and resulting instructions will be made publicly available?

There are 6 Councillors who represent the Wards impacted by the SBLN Scheme. 

![](https://storage.ghost.io/c/7e/00/7e00f3c6-351e-48d6-a922-14b85820294b/content/images/2026/11/image-71.png)

There are [9 Councillors](https://democracy.bristol.gov.uk/mgMeetingAttendance.aspx?ID=12205&ref=bristol-uncovered.uk) who sit on this Committee. Only one of whom (Ed Plowden) represents an impacted ward.

![](https://storage.ghost.io/c/7e/00/7e00f3c6-351e-48d6-a922-14b85820294b/content/images/2026/11/image-70.png)

The mitigating action for this risk is that "**ward member disagreements escalated to political part(y) to be dealt with at party level**".

With the outcome that **“This will minimise re-design.”** It suggests that resolving political disagreements is intended, at least in part, to protect the existing design from further changes, rather than necessarily reconsidering its merits.

****Prediction:** Expect the ****Green** Councillors (4 of 9) to vote for the SBLN. 90% Certainty Likelihood

---

It is possible that the Labour Group see the resident's discontent to the SBLN Scheme as an opportunity to gain votes in the impacted wards when the next Council election take place in May 2028.

![](https://storage.ghost.io/c/7e/00/7e00f3c6-351e-48d6-a922-14b85820294b/content/images/2026/11/image-72.png)

****Prediction:** Expect the ****Labour** Councillors (3 of 9) to vote against (or abstain) : 50% Likelihood

If Labour and Green (7 of 9) vote for the SBLN, then the votes from the other parties won't matter. But what if the Green's do need the support of other parties?

---

### Risk 4 - Transport Committee may not vote to approve the FBC, which would halt delivery of the project.

Key Cause: **Liveable Neighbourhood schemes are complex and can be politically sensitive.**

Key Consequence: S**cheme does not proceed**

Existing Controls: **Early briefings with Transport Committee members to manage risk**

Additional Mitigation Actions: **Target engagement with Lib Dem member to ensure that the scheme addresses any concerns**

****My Summary:** Do everything you can to secure the vote of Nicholas Coombes.

---

This is clear evidence that the Liberal Democrat (Nicholas Coombes) Committee Member has been targeted for "special attention". But Councillor Coombes represents Westbury-on-Trym and Henleaze, which will not be impacted by the SBLN Scheme, so why is he getting "special treatment"?

- Why was a Liberal Democrat member specifically identified for targeted engagement?
- Were equivalent opportunities provided to Labour and Conservative committee members?
- Did the targeted engagement result in changes to the scheme?
- Were any assurances, concessions or commitments made?
- Were the meetings and resulting actions formally recorded?
- Was the purpose to improve the scheme or to reduce the likelihood of an adverse committee vote?

---

The vote to approve the full business case for the SBLN takes place on [03/12/2026](https://democracy.bristol.gov.uk/ieListDocuments.aspx?CId=665&MID=12205&ref=bristol-uncovered.uk).