This page describes the process used to implement the South Bristol Liveable Neighbourhood Scheme.

1 - Interactive Map
The main tool used for engagement was an interactive map. All the tools and methods of engagement led to the comments being added to the interactive map which has been used as the main tool to gather feedback from residents. The map was designed to allow for contributors to add comments outside the boundary of the project to take on feedback from surrounding areas. [Page 8]
2 - Survey
Alongside the interactive map, a survey was available to fill in. The survey was designed to be very similar to the interactive map. The questions on the survey were the same questions the contributors answered when placing their pins. People submitting the survey were asked to name the street for the issue they were reporting. [Page 9]
3 - Comments and Suggestions
The interactive map received 6,081 comments from 1,562 different users between 5 July and 30 October 2024. On a separate survey, we received 513 submissions. These have been considered separately but have been reported to the relevant designing team. [Page 19]
These comments are not available to Citizens to view. An FOI request was made on 16 Jul 2025 asking for this data to be published.
4 - BCC Analysis
The BCC Design Team analysed the comments provided by Citizens.
5 - Engagement Report
BCC Published the Engagement Report on 10 Jul 2025.
6 - Arup Analysis
BCC sent all SBLN information to Arup so that they could formulate proposals.
7 - Proposals
To be published